LSS Blog

Masurari de teren si drenaj in regiunea Prutul de Jos

Masurari de teren si drenaj in regiunea Prutul de Jos

Land Support Systems was hired by Millennium Challenge Account – Moldova to undertake “Lower Prut River Land & Drainage Survey” assignment.

The assignment entails the the land surveying of the project area focusing on the drainage systems of the two CISs and consists of: (i) establishing survey control and a baseline elevation to enable designers to monitor groundwater hydrology, to implement rehabilitation activities, and to evaluate the project; (ii) surveying previously installed groundwater monitoring wells to establish the well elevations and locations; (iii) establishing two (2) river staff gauges to monitor river stage; (iv) surveying profile cross-section transects across surface drains to enable designers to define the limits of excavation and estimate quantities; (v) mapping of main and secondary drains in the unmapped portion of the Cahul project area; and (vi) establishing the drainage system connectivity and flow directions.